Engineered to significantly expand production capacity for the Versius® Surgical Robotic System, the facility supports the global deployment of robotic-assisted surgical technology. Working alongside the architect, structural engineer, and contractor under an exceptionally demanding schedule, our building services consultancy delivered an integrated, highly resilient M&E infrastructure tailored to the rigorous operational demands of high-tech medical device manufacturing.
To align with the project’s BREEAM “Very Good” target and lower operational carbon emissions, Bedwell MEP incorporated a comprehensive suite of sustainable building services. The facility features a roof-mounted photovoltaic (PV) array, rainwater harvesting and reuse systems for public health facilities, electric vehicle (EV) charging infrastructure, and a green roof design. Our scope included power distribution, high-efficiency HVAC climate control, process public health engineering, building energy management systems (BEMS), and advanced life-safety systems. The completed development earned the Best Commercial Project award at the Eastern Echo Awards 2023, establishing a modern, future-proofed manufacturing hub for global innovation in Cambridgeshire.